Project Summary Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a leading confectionery manufacturing site in York. This initiative reflects a notable step forward in the client’s Environmental, Social and Governance framework, enhancing process stability and ensuring measurable reductions in both energy demand https://hypebookmarking.com/story20499351/energy-efficient-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction