The very first park has a capability of 200 MW whilst Sandrini II features a capability of 100 MW. The total expense of both tasks weren't disclosed nevertheless, through construction, over two hundred workers were utilized. The assignments are envisioned to discover a handful of positions opening up for long https://bestsolaragencyinfresno.blogspot.com/