The peak of the ground beam ordinarily will depend on the expected degree of the ground floor slab. I've seen a lot of configurations. Occasionally, the best with the beam flushes Along with the leading in the pile cap, although sometimes it rises previously mentioned the pile cap and receives https://margarets246pqr9.like-blogs.com/profile